Decommissioning Campaign of 52/5A Platform - Hewett Field

Eni UK Limited has awarded Scaldis the contract for the engineering, removal, transportation and disposal (EPRD) of six (6) Eni Hewett Platforms in the Southern North Sea of the UK.

The offshore operations are scheduled to take place in 2024, 2025 and 2026 with preparatory works and modules lifts being carried out by the Heavy Lift Vessel Rambiz, and the main lifts being executed by the Heavy Lift Vessel Gulliver.

Scaldis successfully and safely lifted the first Eni Hewett platform this summer: 52/5A platform.

Our HLV Rambiz first removed the 52/5A modules and accommodation complex. Then the HLV Gulliver was mobilized for the subsequent removal of the remaining topside and jacket.