Market: Civil Construction
Scope of Work: Stacking operation, Lifting of Section S-620 and set-down onto Section S-610 for Johan Sverdrup Drilling
Location: Grimstad, Norway
Client: AS Nymo
Period: February 2017
HLV: Rambiz
Mid February 2017 Rambiz executed the stacking operation of a drilling module S-620 onto its substructure S-610 at a yard in Norway. Total weight of the drilling module was 1330 T.
Through a good cooperation between Rambiz crew and client an accuracy within millimeters could be achieved.
The complete drilling unit is part of the “Johan Sverdrup” offshore platform.